Leoch participates at DCW London 2026
Powering What Keeps Data Centers Running ⚡🇬🇧
The data center landscape is evolving fast — and power resilience is no longer optional.
At Data Centre World London 2026, Leoch EMEA will be on the ground to connect with professionals shaping the future of UPS systems and mission‑critical infrastructure.
📍 DCW London 2026
📅 March 4–5, 2026
📌 Excel London
📍 Stand G95
🔹 What to expect at our stand:
• Reliable battery solutions for UPS & data center applications
• Technologies designed to support uptime, efficiency, and long‑term performance
• Conversations around resilience, scalability, and real‑world operational needs
If reliable power is central to your data center strategy, let’s connect and explore how energy storage can support your critical operations.
👉 Visit us at Stand G95 and start the conversation.
Media Contact
Elia Mitropoulou
Email: elia.mitropoulou@leoch.com
Tel.: (+30) 210 5760318
LEOCH EUROPE S.A. (EMEA region headquarters)
5, Filikon Str.
121 31 Athens Greece
Tagged Preview Event